Browse Items (236 total)

12.jpg
Black and white halftone photograph showing the concrete protection to banks, during fourth Welland Canal construction, c. 1920. From the booklet "Welland Ship Canal (Under Construction)" by the Department of Railways and Canals.

IMG_20230118_0009 (2).jpg
Black and white photographic print showing the constructing of flight locks (Twin Flight Locks 5 and 6) on the Fourth Welland Canal at Thorold, c. 1927-1932.

133.jpg
Colour slide showing construction beginning on the east bank of the canal for the Division Street Bridge, as seen from the Main Street Bridge, June 1980.

136.jpg
Two colour slides showing construction beginning on the east bank of the canal for the Division Street Bridge, as seen from Merritt Park, June 1980.

132.jpg
Colour slide showing construction beginning on the west bank of the canal for the Division Street Bridge, as seen from the Main Street Bridge, June 1980.

135.jpg
Two colour slides showing construction beginning on the west bank of the canal for the Division Street Bridge, as seen from Merritt Park, June 1980.

IMG_20230118_0013 (2).jpg
Black and white photographic print showing construction blasting at Ramey's Bend to allow water into dry cut of Welland Canal, Port Colborne, c. 1927-1932.

IMG_20230118_0014 (2).jpg
Black and white photographic print showing construction blasting on the Welland Canal between Welland and Port Colborne, c. 1927-1932.

IMG_20230123_0002 (3).jpg
Black and white photographic print showing a Fourth Welland Canal construction crew posing for a group photo, c. 1928.

IMG_20230118_0011 (2).jpg
Black and white photograph showing construction of the canal bank, c. 1930-1932
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2