Black and white halftone photograph of the west wall of Lock 1 during fourth Welland Canal construction, c. 1920. 34 feet yet to be built is shown as a dotted illustration. From the booklet "Welland Ship Canal (Under Construction)" by the Department…
Black and white halftone photograph of Lock 2 during fourth Welland Canal construction, c. 1920. From the booklet "Welland Ship Canal (Under Construction)" by the Department of Railways and Canals.
Black and white halftone photograph of the interior of the filling culvert in the west wall of Lock 1, during fourth Welland Canal construction, c. 1920. Size is 14 ft. x 16 1/2 ft. From the booklet "Welland Ship Canal (Under Construction)" by the…
Black and white halftone photograph showing the concrete protection to banks, during fourth Welland Canal construction, c. 1920. From the booklet "Welland Ship Canal (Under Construction)" by the Department of Railways and Canals.
Colour photographic postcard of locks 4, 5, 6 at Thorold on the Welland Canal, undated. Text on the back of the postcard reads: 'Locks 4, 5, 6 at Thorold, Ontario: The St. Lawrence Seaway in the broadest sense, is a huge water-way extending 2,300…
Colour photographic print showing a ship going under the Main Street Bridge in its twilight year operating on the Welland Canal, c. 1971. The name of the ship is Black Bay and it was of the Canada Steamship Lines.